FEATURED PROJECT: Parker Drilling: Rig 273
Thompson Metal Fab (TMF) supplied 2.2 million pounds of fabricated steel for the AADU Rig 273 project, complete with pre-mounting mechanical equipment. The sub-assemblies were fabricated as large as the inside our facility would allow before being transported straight out to our 12-Acre Assembly yard for completion. The Rig 273 project also included fabrication of the following elements:
- Carrier Base
- Skid Unit
- Drilling Module
- Mud Module
- Utility Module
- Drill Floor
- Mast