PROJECT OVERVIEW
In 2021, Thompson Metal Fab shop fabricated three stoplogs for the Norway Dam in Monticello, Indiana. Each stoplog was 8’ H x 32’ L and weighed 17,500 lbs. Stoplogs are an engineering device which help the dam operators manage the flow of water through the dam. Stack testing (required by specification) is shown above.
PROJECT HIGHLIGHTS
• TMF provided on-site representation during installation at the jobsite
• TMF received the maximum allowable payment bonus for early delivery
• The bulkheads shipped fully assembled
• Tolerances (1/16”) were met without the need for machining
• Supply included QTY (1) lifting beam – load test performed by TMF
Thompson Metal Fab shop fabricated for the US Army Corp of Engineers a Removable Spillway Weir (RSW). The RSW measured 70’ W
Learn More
Thompson Metal Fab received the contract to shop fabricate a set of Miter Gates for the US Army Corp of Engineers at
Learn More
Lake Cushman Net Transition Structure & Floating Surface Collector
As part of Tacoma Power’s Cushman Hydro Electric Project, Thompson Metal Fab supplied
Learn More
As part of a large retrofit project at Poe Dam, Thompson Metal Fab was contracted to manufacture a new Floating Bulkhead and
Learn More
Round Butte Dam Fish Passage
PGE and the Confederated Tribes of Warm Springs spent many years researching options to restoring fish passage
Learn More
ROCKY REACH DAM INTAKE HEAD GATE
Thompson Metal Fab manufactured 1 of the 3 required gates during a Chelan County PUD Intake
Learn More
PROJECT OVERVIEW
In 2021, Thompson Metal Fab shop fabricated three stoplogs for the Norway Dam in Monticello, Indiana. Each stoplog was 8’
Learn More
PROJECT OVERVIEW
Thompson Metal Fab joined this $200M construction project at the Port of Alaska during the second phase of construction. The
Learn More
PROJECT OVERVIEW
Thompson Metal Fab manufactured two range towers for the US Coast Guard in Honolulu, HI. The range towers were fabricated
Learn More
PROJECT OVERVIEW
This was a supply contract for two Spillway Weir Closure Leaves at McNary Dam. Each structure is approximately 53’-0” W
Learn More
Thompson Metal Fab fabricated multiple structures associated with the Gate 1 retrofit at Cougar Dam. Scope of supply included: End Frames w/
Learn More
Navigation Lock Lift Gate – Lower Monumental Dam
Project Overview
Thompson Metal Fab received the contract to shop fabricate a new Lift
Learn More
Point Thomson Service Pier
The first part of the decade saw ExxonMobil take large strides in the development of the Point Thomson
Learn More
Priest Rapids Dam Stop Logs
Priest Rapids Dam is located on the Columbia River in Grant and Yakima counties. Thompson Metal Fab
Learn More
Bangor Mooring Camel
Project Overview
Fabricated by Thompson for the Bangor Naval Base in Silverdale, WA; this floating maintenance dock is known
Learn More
PROJECT OVERVIEW:
Thompson Metal Fab is replacing 5 of the 10 radial gates (specifically, those in slots 6 through 10) for Wirtz
Learn More